It SHOULD be 2" from the connection, (and that connection has specific requirements for how you do it), for the two sinks to the main stack. Until you open the wall, there is no way you can tell HOW you are going to do it, and in some cases it requires a major repiping to do it correctly.





Reply With Quote
Bookmarks