Two questions:
1] should I run the tile of my tub surround down the edge of the tub right to the floor? Or just stop at the tub edge? Is there a right/wrong with this?
2] And what about the top... should I go right to the ceiling? I was going to stop about 1 foot from the ceiling, just above the showerhead and leave a 1 foot band that would simply be painted.
Lance
1] should I run the tile of my tub surround down the edge of the tub right to the floor? Or just stop at the tub edge? Is there a right/wrong with this?
2] And what about the top... should I go right to the ceiling? I was going to stop about 1 foot from the ceiling, just above the showerhead and leave a 1 foot band that would simply be painted.
Lance