Or look at the back of the switch to see which terminals are marked "Line 1" and which are "Line 2".
|
|
|
Label a switch terminal "1".
Find a terminal that has continuity to 1 and label it "2". Label the other two terminals 3 and 4 and check that they have continuity and
that there is no continuity between 1 & 3.
Flip the switch lever:
if there is now continuity between 1 and 3 there should also be between 2 & 4 and none between 1 & 2.
or
if there is now continuity between 1 and 4 there should also be between 2 & 3 and none between 1 & 2.
Or look at the back of the switch to see which terminals are marked "Line 1" and which are "Line 2".
Bookmarks