Terry Loves Bellevue & Kirkland
425-649-5683, Top Rated Plumber 1-877-808-5683
Results 1 to 3 of 3

Thread: Threaded pipe behind finished wall...

  1. #1

    Default Threaded pipe behind finished wall...

    I'm installing a Symmons shower valve with a diverter and hand shower. The rough in directions say that the hand shower connection is a 1/2" threaded pipe that ends 1/4" behind the finished wall. What's the best way to deal with this?

    If I put the pipe in and then finish the wall, how do I get tape/joint compound on the threads before putting on the adapter, since they're now behind the wall?

    If I leave the pipe off until after I finish the wall, how do I install the pipe and make sure the connection isn't leaking.

    I suppose another option is to install the pipe and the brass fitting before the wall goes up and just protect the fitting with some kind of covering.

    I guess the 3rd option, which just occurred to me would work the best. How do you handle this situation?

    Ken

  2. #2

    Default

    Use Oatey Pipe Joint Compound on the female side of the elbow
    You should protect your threads on your wall pipe with a female coupling until your tile job is finished.

  3. #3
    Moderator & Master Plumber hj's Avatar
    Join Date
    Aug 2004
    Location
    Cave Creek, Arizona
    Posts
    23,550

    Default pipe

    You put the fitting the proper distance behind the wall. Finish the wall and tiling. Then put the sealant onto the proper sized pipe, screw it into the shower fitting, then put sealant onto the other end and screw it into the fitting in the wall, then tighten the whole mess by turning the shower fitting.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •