Thread: How to level a basement floor

Hybrid View

  1. #1

    Default How to level a basement floor

    I find this forum helpful so I hope I can get some help with this problem... I am finishing a basement in a 60 year old house. I have a very uneven floor and it slopes what seems like about 2 inches or so from highest point to lowest across the basement. I am putting up partition walls and the finished area will be sandwiched in between an area of about 8 feet on both outer walls to accommodate storage, utilities, sump. etc...To explain it better.. if you were looking at the house from the front you would see from left to right, foundation, 8 foot area then a wall, then 17 foot area then another wall and another 8 foot area and then foundation. I hope that makes sense.

    My idea was to put down the floor plates and pour self leveler and have it contained by the floor plates but the concrete is so wavy that the plates don't sit flat.

    My Dad's advice is to move. I rope him into all these projects that seem easy at first and they never are.


    Any advice is much appreciated...

  2. #2
    DIY scratch-pad engineer leejosepho's Avatar
    Join Date
    Nov 2006
    Location
    200 miles south of Little Rock
    Posts
    2,474

    Default

    Quote Originally Posted by woog View Post
    My idea was to put down the floor plates and pour self leveler and have it contained by the floor plates ...
    I would first use a transit or a laser to establish and mark a new level-and-flat floor line along the walls, and then I would drill a grid pattern of holes in the floor (maybe 6' x 6' or so) for some short pieces of rebar to be driven in and to stand as posts for holding leveled screed guides. When you pour the concrete, the guides can be removed and the posts can be driven down as you go along, and that should leave you with a nicely-finished level and flat floor for your remodel.

    Note: Do not drill into or through any plumbing!
    Last edited by leejosepho; 02-15-2009 at 03:54 PM.

  3. #3
    DIY Senior Member thezster's Avatar
    Join Date
    Jul 2005
    Location
    Fort Collins, Colorado
    Posts
    230

    Default

    The idea is to "level" the finished room, right? How much deflection do you have in that new "room" ? Self leveler works great - but is very, very spendy... If you have a 2 inch drop - you'll spend a ton of $$ getting it flat.... I've done a few basements with this problem.. and for the really bad ones - have resorted to a layer of thinset - followed by 1/4 - 1/2 CBU - followed by self leveler (the cheap stuff takes up the most of the deflection)... My tile work on these floors has lasted 2+ years so far - with no cracks/drips/errors.....
    It's 9a.m. Let's have a beer!

  4. #4
    Retired Defense Industry Engineer jadnashua's Avatar
    Join Date
    Sep 2004
    Location
    New England
    Posts
    21,405

    Default

    How much can you afford to lose in headroom? A concrete pour could work, but it needs some minimum thickness. What may be eaiser, but expensive, would be self-leveling cement (slc). The least expensive thing to do would be deck mud (mostly sand with some cement in it). Mixing, carrying, and screeding the stuff is heavy work - think of working with wet beach sand. Deck mud would be a fine base for tile and possibly other finished surfaces (it can't be left uncovered - it's not good for abrasion, but is fine for compressive strength - it's the same stuff they use to set tile floors and shower pans). SLC isn't a finished surface, either. A concrete slab pour can be, but finishing it so it is flat and level takes more skill than the average homeowner has. Concrete pours usually don't work all that well if they taper to zero at the high point, so extra thickness is better so it has strength. To bond the concrete pour, you'd want to using a bonding agent. SLC needs a special primer. Deck mud you can prime the slab with a slurry of cement...cover before it sets.

    SLC pours can be made a little more ecconomical if you use some pea gravel in the thicker areas to use up some of the required volume. SLC will essentially level itself IF you can mix and pour it fast enough so what you have is still liquid (think pancake batter). Some versions start setting within 10-minutes of when it gets wet, so you have to mix and pour quickly. There are versions that set slower - up to about 30-minutes. If you don't pour quick enough, it's sort of like moving a partially cooked pancake...really messy, and not smooth! The stuff is expensive, but if done right, is quick and produces a great result, or can be a very expensive mess.
    Jim DeBruycker
    Important note - I'm not a pro
    Retired Defense Industry Engineer; Schluter 2.5-day Workshop Completed 2013, 2014

  5. #5

    Default Thanks for all of the responses

    I like all of the ideas, thanks... seems like more work than I thought. Can I put down bottom plates for the wall in different pieces to compensate for the difference in the floor and then just cut each stud to fit. I don't plan on putting flooring down that needs to be level although I would like it to be... I'll live without a level floor if this is possible... Thanks

  6. #6

    Default

    Your stud idea seems like a lot of work. I would build the stud wall to the minimum size and just shim it out with ripped 2x4's. Then I'd screw the bottom plates through the shims into the slab. Basement walls are non weight bearing. You just need to make sure they will stay up. Now the drywall job after that will also be a easy because you just hide the unevenness with the wall trim.

    Tom

  7. #7
    Remodel Contractor GabeS's Avatar
    Join Date
    Jan 2007
    Location
    Brooklyn NY
    Posts
    294

    Default

    Do it right. Level your floor, you'll be happier in the end. You don't have to cover the whole floor with self leveling cement. Just the low spots to make them even with the higher ones.

    Build your walls with one bottom plate(put a piece of plastic between the wood and cement) and then just cut the studs to fit.

    Put your sheetrock(paperless preferred for basements). Finish your walls and ceiling completely with paint. Then level your floor. Then put your finish floor material. Then your mouldings last. Everything will look straight, the way you want it. No slants.

    The extra money and work to MAKE your floor level is necessary in my opinion.
    Gabe

    Don't follow my advice, I only know a thing or two about a thing or two.

  8. #8

    Default

    GabeS,

    His basement is domed in the middle. I've seen this many times. The only way to fix this with any reasonableness is to do a pour. But due to minimum thickness he's going to have to pour a lot of cement in there.

    From my perspective it depends on what he wants to do with it. Though in general I agree, level it first.

    Tom