I would first use a transit or a laser to establish and mark a new level-and-flat floor line along the walls, and then I would drill a grid pattern of holes in the floor (maybe 6' x 6' or so) for some short pieces of rebar to be driven in and to stand as posts for holding leveled screed guides. When you pour the concrete, the guides can be removed and the posts can be driven down as you go along, and that should leave you with a nicely-finished level and flat floor for your remodel.
Note: Do not drill into or through any plumbing!