I thought that I could try using a motorized post hole digger with some pipe added to extend further into the ground. Then I was going to slide a 4 inch pvc pipe into the hole for the casing.
Is this a good option or should I just try a drive point well? I am trying to gain the most water I possibly can!
sticks
Is this a good option or should I just try a drive point well? I am trying to gain the most water I possibly can!
sticks