I am moving some DWV piping in the basement prior to developing.
The main DWV pipe in this first picture needs to be moved to the other side of the main beam and connected to the sink drain shown in the second picture.
The last picture is how I think the two should be connected maintaining a cleanout access point.
Does this layout look acceptable?
Is there a better way that anyone can suggest?
The main DWV pipe in this first picture needs to be moved to the other side of the main beam and connected to the sink drain shown in the second picture.
The last picture is how I think the two should be connected maintaining a cleanout access point.
Does this layout look acceptable?
Is there a better way that anyone can suggest?