The terminal block is in & the wires I have run so far are connected
Plugged in our 2nd phone - working
I'll check the rest of the plugs tomorrow
Now I can start Terminating the CAT5e runs in the basement
|
|
|
The terminal block connection is just for the phone
We will probably end up with 3 hard wired phones, then some wireless. But as long as I'm wiring I might as well run the wire
Someday I may go back & use a punch block
All CAT5e wire has been run for the Network
I have a 24 port CAT5e patch panel & CAT5e quickport connectors for the other end. Verizon supplied the wireless router, everything has been up & running for over 2 years. I'm building an addition & finishing up the 2nd floor dormer
So it was time to run the low voltage wiring before the insulation goes in
I will still have access to most areas after the drywall goes up
But it's easier to do it now, and its cold out so I'm doing inside work
Thanks
DIY Handyman (not 4 hire)
I have enough to do to my own house
The terminal block is in & the wires I have run so far are connected
Plugged in our 2nd phone - working
I'll check the rest of the plugs tomorrow
Now I can start Terminating the CAT5e runs in the basement
DIY Handyman (not 4 hire)
I have enough to do to my own house
Bookmarks