I bid out the shell of a room and bath addition (crawl space foundation, framing, roofing, windows and exterior). I did not bid out the plumbing at all, I was going to do that seperately in March. The way the addition is layed out we have no external walls with plumbing fixtures so I do not have an issue passing framing inspection.
We are choosing the contractor for the shell this week. All of the contractors added plumbing and electrical to their bids. Just looking for opinions on the plumbing numbers I got.
Bathroom addition is 9x13'. Toilet, tub, shower w/ two heads, two sinks.
To reach the bathroom we'll need about 45ft of 3 in drain pipe
-First bid was 6950 for rough/finished plumbing w/ pex and I provide all fixtures including tub/toilet. This is the total price
-Second bid was 6800 for rough/finished plumbing w/ pex, I provide all fixtures including tub/toilet. I pay GC 20% of the 6900 and get a 5yr warranty
-Third bid was 5000 for rough/finished w/ pex, i provide all fixtures
Thoughts? I'm not sure what to think
I'm in Folsom Ca, which is just outside Sacramento.
Thanks
We are choosing the contractor for the shell this week. All of the contractors added plumbing and electrical to their bids. Just looking for opinions on the plumbing numbers I got.
Bathroom addition is 9x13'. Toilet, tub, shower w/ two heads, two sinks.
To reach the bathroom we'll need about 45ft of 3 in drain pipe
-First bid was 6950 for rough/finished plumbing w/ pex and I provide all fixtures including tub/toilet. This is the total price
-Second bid was 6800 for rough/finished plumbing w/ pex, I provide all fixtures including tub/toilet. I pay GC 20% of the 6900 and get a 5yr warranty
-Third bid was 5000 for rough/finished w/ pex, i provide all fixtures
Thoughts? I'm not sure what to think
I'm in Folsom Ca, which is just outside Sacramento.