Some of you may remember that I broke up my basement slab a couple months back to scope out the DWV with an eye towards adding a 2" drain and vent tie-in. I got the building permit. I have finished the insulation and am almost done with the framing. I called about the plumbing permit and they want a plumbing plan (and $130 flat fee including the plan review and up to 3 inspections). Does anyone have any tips creating the plumbing plan. Do you think they want the water and dwv for the whole house?