Any tips for the do it yourselver, gonna replace my submersised well pump. any tips on lifting and holding while I take the pipes apart? As far as I can tell its about 70 feet of 1-1/4" galvinized pipe. I figured on building a tripod with 4*4's and using a come along to lift. Trying to figure out how to grab the pipe, wrap a chain or rope to choke the the pipe? Then how do I hold it to regrip, and to disassemble?