Hi all,

I just had a plumbing company out and they said since I do not have a full basement (tri level with floor drains) they could not install an overhead sewer. Instead they are installing a check valve system.

I was wondering if this seems right?

Thanks
Brad

http://www.evereadyfloodcontrol.com/dellvalve.html