|
|
|
Hi all,
I just had a plumbing company out and they said since I do not have a full basement (tri level with floor drains) they could not install an overhead sewer. Instead they are installing a check valve system.
I was wondering if this seems right?
Thanks
Brad
http://www.evereadyfloodcontrol.com/dellvalve.html
Bookmarks