I'm getting ready to install new tile and realize that after I put in new cbu and tile -- the new toilet flange will be about 0.2 inches above the finished floor.
Any advice on what to do?
Could I use a spacer between the finished floor and and bottom of flange or could I remove 0.2 inches of material from the bottom of the flange or any other recommendations?
I can provide a picture if needed.
Thanks.
Any advice on what to do?
Could I use a spacer between the finished floor and and bottom of flange or could I remove 0.2 inches of material from the bottom of the flange or any other recommendations?
I can provide a picture if needed.
Thanks.