Thread: Breaking out a 4-inch thick boiler in basement

  1. #1

    Default Breaking out a 4-inch thick boiler in basement

    Hi, I am pulling my hair right now. I have a 3-4 inch thick cast iron boiler taking up a lot of needed space in my basement area and I want it out!!! We have managed to get the sections broke apart , but the 4th section (about 20 inches in height)is so large that I know we will not be able to get it out of the doorway without breaking it. The sectioned parts are so heavy that I will have to have at least 3-4 big men to take it out. If anyone has any suggestions, besides a sledge, sawzall, (have tried these methods) please let me know. Every time we hit it, it slides closer and closer to my water heater and I am afraid it's going to get knocked off of the base and into it. It's quite the disaster and am desperately in need of help. Any suggestions please!

  2. #2

    Default

    How about hiring a guy with a torch to cut it?

    Tom

  3. #3
    Moderator & Master Plumber hj's Avatar
    Join Date
    Aug 2004
    Location
    Cave Creek, Arizona
    Posts
    25,615

    Default boiler

    Do you have any idea how long it takes to cut, actually melt, cast iron with a torch? Something it wrong here. A 20" high boilet section should not be that big, and it is not solid metal so it should eventually break with a sledge hammer. Even, a 5' high by 4' wide end section would be heavy, but not impossible to move.

  4. #4
    Computer Programmer Bill Arden's Avatar
    Join Date
    Sep 2006
    Location
    MN, USA
    Posts
    584

    Default

    I've always liked using a 4-1/2 inch angle grinder with those thin cutting disks.

    I've cut threw I beams and even 1 inch thick steel.
    Important note Ė I donít know man made laws, just laws of physics
    Disclaimer: I'm a big fan of Darwin awards.

  5. #5
    DIY scratch-pad engineer leejosepho's Avatar
    Join Date
    Nov 2006
    Location
    200 miles south of Little Rock
    Posts
    2,474

    Default

    Quote Originally Posted by mugsymiller View Post
    The sectioned parts are so heavy that I will have to have at least 3-4 big men to take it out.
    Before doing that, have everyone involved take a very close look at your stairway. Four men at 150 lbs. each to carry a 300 lb. part would add up to nearly half a ton on two steps at about three feet apart, and a point load like that would quite possibly collapse my own basement stairs. A much better bet would be to cover the stairs with some long lumber so the heavy parts can be pulled up the stairs with a winch.

  6. #6
    Master Plumber master plumber mark's Avatar
    Join Date
    Feb 2005
    Location
    indianapolis indiana - land of the free, home of the brave....
    Posts
    4,243
    Blog Entries
    1

    Talking do what HJ says to do....

    all you need to do is get a large sledje hammer


    and break it up into smaller pieces...

    It is cast iron so it
    should break up .if you smack it hard enough.