I don't why your inspector wants water above your overflow to test the rest of the drain piping. I would suggest disconnecting trap and putting a fernco cap on the drain line to the tub. Test out waste and overflow later by plugging tub until water goes into overflow.





Reply With Quote
Bookmarks