Thread: foundation opening for plumbing

  1. #1

    Default foundation opening for plumbing

    Hi,
    Does anybody know whether I can open in (E) foundation a 6" hole for 4" sewage pipe to go through? Any change in structure I need?
    Another question is that if I have an opening of 18Hx30W in (New) foundation wall, can I use it for 4" pipe to go through?
    I refer to city code allowance for foundations of a crawl space house, crawl space of 18" high.
    thanks a lot,
    Last edited by lastguy; 05-17-2005 at 05:28 PM.

  2. #2
    Engineer jdkimes's Avatar
    Join Date
    Sep 2004
    Location
    Littleton, CO
    Posts
    181

    Default

    Not sure if Lastguy still needs an answer but, for the existing foundation I'd generally say that it's acceptable although if the hole cuts some re-bar it might be prudent to install some steel channel or plate above or below the hole extend 2-3ft on either side and fastened with 1/2"x 5" lag bolts to the foundation every 1ft.
    As for the pipe through the existing opening I'm confused about the question.
    Sounds like you want to run a pipe through a window

  3. #3
    Moderator & Master Plumber hj's Avatar
    Join Date
    Aug 2004
    Location
    Cave Creek, Arizona
    Posts
    23,543

    Default hole

    You can break or drill a hole as necessary. As long as the pipe does not affect access to the crawl space you should be able to run the pipe through the opening.

  4. #4
    Master Plumber master plumber mark's Avatar
    Join Date
    Feb 2005
    Location
    indianapolis indiana - land of the free, home of the brave....
    Posts
    4,164
    Blog Entries
    1

    Talking install a sleeve on the pipe.

    sometimes , depending on what this is going through , its also not a bad idea to install a larger section of pipe to make a sleeve for the pipe to go through...in this area its code to portect the pipe when going ito or out of a building,

    we have had inspectors wanting to see a 3 inch pvc pipe going through a sleeve to protect the line...

    it is not very hard to do. and if you are going out of a foundation into another section of room or underground to something,

    its very likely if they see it they will require a sleeve on the pipe....

    installing a sleeve after the work is done can really be a problem.
    Last edited by master plumber mark; 05-26-2005 at 04:39 AM.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •