Hi folks,
Instead of hiring someone to install a second meter, I'm planning to just cut the copper pipe going to the outside spigot. It's 3/4" pipe then becomes 1/2" then to the spigot. Or maybe, I'll use a 1" copper pipe instead of 3/4" like what I said on the drawing.
Below is the picture of what I will be cutting. Can someone please make some comment about my drawing like if something is missing or it's totally wrong?
Any help would be greatly appreciated.
Instead of hiring someone to install a second meter, I'm planning to just cut the copper pipe going to the outside spigot. It's 3/4" pipe then becomes 1/2" then to the spigot. Or maybe, I'll use a 1" copper pipe instead of 3/4" like what I said on the drawing.
Below is the picture of what I will be cutting. Can someone please make some comment about my drawing like if something is missing or it's totally wrong?
Any help would be greatly appreciated.