Hi folks,

Instead of hiring someone to install a second meter, I'm planning to just cut the copper pipe going to the outside spigot. It's 3/4" pipe then becomes 1/2" then to the spigot. Or maybe, I'll use a 1" copper pipe instead of 3/4" like what I said on the drawing.

Below is the picture of what I will be cutting. Can someone please make some comment about my drawing like if something is missing or it's totally wrong?

Any help would be greatly appreciated.