Okay, so I have about 12 inches of 7" round coming down from the roof. Then it's another foot to the top of the cabinet, then 20 inches down to the motor which has a 3x14 duct opening. I just spend another wasted day trying to make a nice connection using 3x14 duct up to a transition at the top of the cabinet, and then some 7' to connect to the stub coming down. I even tried an adjustable swivel connector thingy but I just can't figure out how to join it all together without some sort of slip-fit connector. How do you guys install duct when you can't move either end of the run? I understand flex is a no-no but I only would need a few inches. I hope this is understandable and thanks for any help.