bigboxer
New Member
- Messages
- 4
- Reaction score
- 0
- Points
- 0
I am installing a new toilet in upper bath, replaced cast iron stack with ABS and was wondering.. If you look at my attached pic... will this work?
Initial slope will be 1/4" per ft. than a 45% drop to stack, total about 5ft from stack...
DO you see any problems with this??
Initial slope will be 1/4" per ft. than a 45% drop to stack, total about 5ft from stack...
DO you see any problems with this??