We have a 0.5" lead service line that was tapped in 1901 in Denver that gives us good pressure 80 psi but very poor flow ~2.5 gpm. The main line is ~30' (in the street) from the meter pit and another 50' to the hot water heater. The city requires the line be buired 4.5', so that would be more hand digging than I would want to or can do. We have two quotes to put in new 0.75" copper line between $4000 and $5000, which seems high for a days work and does not include the permit fees. Any comments or suggestions to help us reduce the cost?