As a follow-up to my original question, I'm thinking that the sub-panel should be sized for 40amps with a 8/3 feeder from the main breaker box. The circuits from the sub-panel would be 20amp circuits using 12/2. Does that seem right?
What size of conduit for under the slab does the 8/3 feeder need to be in?