musicis
New Member
- Messages
- 8
- Reaction score
- 0
- Points
- 0
Finish basement at utility sink. After cutting off the copper hot/cold supply, I still get just enough water to wet the sanded copper I am trying to sweat. I opened up all the valves on the first and second floor. Even after a half hour, I still got some water. It will not drip out until I try to dry it with paper towels. I put shut off valves in the wall in the meantime. But tomorrow I need to remove the valves and do some sweating to accommodate the utility sink and the washer/dryer. I assume it has to be dry completly before the sweating? There is just enough water that it will get on the flux. Any ideas would be greatly appreciated.