Hi,
I am about to install a new tub.
The bottom of the soaker tub is 1.5" above the ground level.
(apron of tub is lower than tub bottom by the 1.5". Why, I have no idea!)
In the instructions it says;
"Ensure the bathtub rests solidly7 on the installed supports. Shim tub as req'd to insure a level installation. It is recommended that a layer of mortar be applied and covered with a 2 ml polyethylene sheet to facilitate levelling.
Now, what the heck kind of mortar would you use?
Thinset or other?
Maybe just cement?
Is tile adhesive considered mortar?
Thx in adv.





Reply With Quote