I am adding a shower in a basement that has a toilet and sink drain already roughed in. I have removed concrete from shower drain to the main drain stack. The main is 4" PVC into a cast iron just below the floor level and seems to be an elbow. How should I connect the shower line into this setup? The main stack is closer to the shower drain than the toilet so it makes sense to go there with it.





Reply With Quote
Bookmarks