How To Plumb & Vent My 3-Piece Basement Rough

Users who are viewing this thread

USMC1970

New Member
Messages
1
Reaction score
0
Points
0
Location
Colorado
The attached photos depict how the 3-piece bathroom rough-in located in our basement was installed by the builder.

The 2-inch PVC by the wall is assumed to be for the sink.
The 4-inch PVC (reduced to 3-inch) is assumed to be for the toilet.
The 2-inch PVC (with trap) is assumed to be for the shower (or tub).
The 4-inch PVC below the 3-piece rough is footer drainage.

I have also attached photos of what I believe is a 1 1/2-inch vent line that was extended into the basement from the first floor (by the builder as well) and am wondering if I am allowed to connect my basement bathroom vent(s) to this line.

As I have been read conflicting information online, can someone please tell me how all 3 of these pieces are plumbed and vented properly.

If there are further questions or additional information is needed, please ask.

Thank you in advance for the help!
 

Attachments

  • 3-Piece-Rough1.jpg
    3-Piece-Rough1.jpg
    33.8 KB · Views: 2,967
  • 3-Piece-Rough2.jpg
    3-Piece-Rough2.jpg
    33.1 KB · Views: 2,884
  • 3-Piece-Rough3.jpg
    3-Piece-Rough3.jpg
    32.7 KB · Views: 2,024
  • Vent Detail First Floor.JPG
    Vent Detail First Floor.JPG
    41.8 KB · Views: 2,396
  • Vent Detail Basement.JPG
    Vent Detail Basement.JPG
    69.3 KB · Views: 2,070
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks