I went back to the Brady website and got their instructions for putting down a wellpoint. I have now gotten the 2"casing down to about 13-14 ft. I had to go through about 2ft of hardpan at the ten foot level but am now back into sand. I am having to drive the casing into the ground as I washed out the clay of the hardpan and now the sand. The problem is that the 2ft of hardpan was/is so dense that I can no longer turn the pipe with a wrench to rotate it although it does go down with hammering encouragement. I am concerned about getting the casing out again after I get to the proper "adequate depth".
Any thoughts on this? I would very much appreciate all the advice I can get.
Thanks, Paul
Any thoughts on this? I would very much appreciate all the advice I can get.
Thanks, Paul
Last edited: