    I'm finishing dry-fitting my cbu & will put it in place using thinset as per the manufacturers instructions in the next day or so. I'll be using a 1/4" square-notched trowel (other opinions appreciated). My question is should I work the thinset in between the expansion joints between the different sheets of plywood subfloor to fill in all gaps under the cbu. Is that right? Or won't that defeat the purpose of the expansion joints. Isn't the thinset supposed to get squished into all crevices anyway as it's screwed down - so won't it get squished into the expansion joints anyway? All opinions welcome & much appreciated.

    Thanks,
    Richard

  2. #2
    Retired Defense Industry Engineer jadnashua's Avatar
    Join Date
    Sep 2004
    Location
    New England
    Posts
    21,397

    Default

    The thinset under the cbu is there to ensure full contact and fill in minor imperfections, the screws or nails hold it down and in place (course the thinset will too, but that is not its primary function under the CBU). Don't worry about the joints in the plywood. The screws hold it together (you can use galvanized roofing nails if you want, it goes faster and is cheaper - works as well from an engineering standpoint). When you get ready to tile, use the special alkaline resistant fiberglass mesh tape and thinset to do the joints (don't use drywall tape). If you do it as you tile, then you are less likely to have speed bumps to tile over. The tape is important as it makes the whole layer monolithic. Failure to tape can cause the cbu joints to telegraph through the tile. Don't line up the joints of the cbu with the subfloor and it is best to never have four sheets meet at one point. It doesn't matter which direction the cbu runs, as opposed to the subfloor, which should always run perpendicular to the joists. If using screws, make sure that they are fully seated and not holding the cbu up (i.e., there's a gap between the cbu and the subfloor). The cbu will flex and follow the major curves of the subflooring (if they exist), it will not really flatten the floor in a major sense (only minor imprefections). My unprofessional opinion.
    Last edited by jadnashua; 03-01-2005 at 08:28 PM.
    Jim DeBruycker
    Important note - I'm not a pro
    Retired Defense Industry Engineer; Schluter 2.5-day Workshop Completed 2013, 2014

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •