spetrucco
DIY Junior Member
Hello,
I am putting in a bathroom on the first floor. I had a contractor in to price out the job. The bathroom is 5x6. I wanted him to quote me a number for the plumbing rough-in. He said any bathroom he does is $4,000 for the rough in (as long as it is typical).
Here are some of the specifics...a 2 inch vent pipe is already in place in the room (not a waste stack). The main pvc waste line is directly below the room in the basement. The $4k will include the shower supply lines and drain , vanity supply lines and drain and the toilet supply and drain. The price also includes setting all the fixtures after the room is finished but no materials are included. Does this sound right? I am putting in a 1-piece fiberglass shower/tub, standard 2-piece toilet and a typical vanity.
Thank You
Shawn
I am putting in a bathroom on the first floor. I had a contractor in to price out the job. The bathroom is 5x6. I wanted him to quote me a number for the plumbing rough-in. He said any bathroom he does is $4,000 for the rough in (as long as it is typical).
Here are some of the specifics...a 2 inch vent pipe is already in place in the room (not a waste stack). The main pvc waste line is directly below the room in the basement. The $4k will include the shower supply lines and drain , vanity supply lines and drain and the toilet supply and drain. The price also includes setting all the fixtures after the room is finished but no materials are included. Does this sound right? I am putting in a 1-piece fiberglass shower/tub, standard 2-piece toilet and a typical vanity.
Thank You
Shawn