cmhealy
New Member
- Messages
- 5
- Reaction score
- 0
- Points
- 1
So I am halfway through my bathroom remodel and I fannaly got to the toilet flange. I was planning on using an offset flange to move my toilet over a couple inches to accommodate a 24" vanity. This is a small bathroom! So I started to dig out around the flange to see what I had and the offset flange that I have won't work because of the depth. I have cast iron plumbing, and the toilet sits on top of a curved "Y". I dug out a good bit of the floor with the thought that maybe I could cut out some of the cast iron and use mission unions to tie in PVC parts to move the drain over altogether? I guess I am stuck as I am feeling a bit over my head at this point! Any help would be appreciated! Here are some pics:
I am trying to move the drain 2-3 inches over to the left
I am trying to move the drain 2-3 inches over to the left when you are looking at the pics. If I moved the whole drain, then I would likely move it back 2 inches as well because it is 14" off the wall now, because the was mud tile job before and I removed all of that.
Any help is appreciated!!
I am trying to move the drain 2-3 inches over to the left
I am trying to move the drain 2-3 inches over to the left when you are looking at the pics. If I moved the whole drain, then I would likely move it back 2 inches as well because it is 14" off the wall now, because the was mud tile job before and I removed all of that.
Any help is appreciated!!
Last edited by a moderator: