I am in the process of finishing a basement bathroom. There is a 2 " vent stack above the rough ins for the sink, toilet and tub drains. My plan is to tie those drains into the 2 inch stack. My problem is my pit for my sewage ejector is about 20 feet away in another part of the basement. Can I continue this vent piping over to the pit and vent my pump as well?
I would have a tub, toilet, sink and pump all on the same 2 inch line. To my knowledge there is nothing else on this vent line and it vents directly to the outside.