Now seems the time to do it. I'm building a large shop behind my house and have been toying with the idea of roughing in a bathroom. Toilet, sink and corner shower. Right now I have a 3' deep utility trench to the shop. No concrete floor yet. No walls on the shed. The excavators are anxious to close me back up though.
I have looked all over the web trying to find info on how to rough this combo in...dimensions, spacing, pipe size, etc... and haven't found what I need.
I'm down hill from my septic tank so I think I want to just stub up a waste pipe. What else should I stub up? How far below the frost line should the waste line be? I'm thinking that I may just have the 4" pipe leave the building and head in the direction of where I may have to put in a new septic for the house. Any source on the internet where I can see some dimensions for a small bathroom that's going to show me pvc pie layout?
Any help would be appreciated. So far, this site has the most info out there! I thought the garagejournal.com would have had what I needed.
Thanks!
I have looked all over the web trying to find info on how to rough this combo in...dimensions, spacing, pipe size, etc... and haven't found what I need.
I'm down hill from my septic tank so I think I want to just stub up a waste pipe. What else should I stub up? How far below the frost line should the waste line be? I'm thinking that I may just have the 4" pipe leave the building and head in the direction of where I may have to put in a new septic for the house. Any source on the internet where I can see some dimensions for a small bathroom that's going to show me pvc pie layout?
Any help would be appreciated. So far, this site has the most info out there! I thought the garagejournal.com would have had what I needed.
Thanks!
Last edited: