Originally Posted by
Scott Alger
Greetings from Chicago
I have decided to install a 6" cleanout in the front of the basement floor so I can get at least a
4" cutter on the sewer rodder and cut the roots back better. I have rodded this line 3 times in the past 10 months but only with
a small cutter because the present cleanout is on the 4" stack pipe I'm thinking a 6" clay "Y" on the pipe but what do I come up
to the floor with? 6' Iron or clay? and what goes on top flush with the floor for the cleanout access etc...
Scott Alger