I am getting ready to start rebuilding my gutted bathroom. Is it a good idea to cover the entire floor with cement backer board, and install the tub and shower on top of that rather than just installing them on the plywood subfloor? I noticed my old shower and tub were placed right on the plywood subfloor and the tile underlayment and tile were butted up to the sides of the shower and tub.