Hi. I'm new here on this forum . I've been pulling my hair out with indecisions, so I thought I'd ask here. I gutted out my bathroom, and am installing a new tub and using a 5 piece tub surround. My questions are ,

Can I install greenboard first,place in the tub and attach to studs, then install the surround? Or, do I install the tub directly to the studs, bring wall board down to flange of the tub, then cover with the surround? I feel this isnt right because the flange obviously isnt the same thickness as the drywall.Some guy told me to bring the board over the flange and caulk.??? A correct procedure using the surround will be appreciated! Is the a vapor barrior needed behind the green board? Thanks in advance!!
 

DIY

Member
Messages
155
Reaction score
0
Points
16
Location
Florida
I have never replaced a tub with pre fabricated tub surrond walls. But, i would think the installation would be much the same as with any other standard tub surround materials used tile etc. As a good practice i checked with some contractors/tile setters/masons and the vapor barrier they suggested that i use for the surround was roofing felt paper i affixed to the studs. However, some said the vapor barrier is only needed at the one block exterior wall where this bathroom i remodeled was located. Then the tub is set in place attaching the tub at stud locations (most tubs come with attaching clips) and plumb up the tub drain. Run your green board,and where it meets the tub flange it might bow in after attaching the board...keep a level handy to check how level the board is and for high and low spots that if unacceptable can make for a wavy tub surround wall.In which case you might have to fur out the studs as necessary to make for a flat level wall to fasten your board to ,and adhere your pre fab walls to.
 

Gencon

Renovator
Messages
48
Reaction score
0
Points
0
Location
Etobicoke, Canada
Website
gencon.piczo.com
Yes, tub goes in first. Connect the waste and overflow then do the board. Use a VB on outside walls only. The green board will not overlap the flange of the tub. Before the panels go on, fill this gap with silicone. The panel will go to the tub surface. This makes for a nice, thick seal.
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks