CCbrands1
New Member
- Messages
- 19
- Reaction score
- 0
- Points
- 0
Drain rough in for a 1/2 bath in basement.
1 1/2" vent at the vanity drain line.
Toilet drain is upstream of the vent.
Drains beneath concrete.
I want to add a shower into the mix.
I plan to install a 3 x 2 wye after the vent for the vanity drain line.
Is it ok to run the shower drain line in this way?
Or should it be tapped in between the vent and the toilet?
Code references would be great, but general comments on how either way would effect drainage would also be good.
thanks
1 1/2" vent at the vanity drain line.
Toilet drain is upstream of the vent.
Drains beneath concrete.
I want to add a shower into the mix.
I plan to install a 3 x 2 wye after the vent for the vanity drain line.
Is it ok to run the shower drain line in this way?
Or should it be tapped in between the vent and the toilet?
Code references would be great, but general comments on how either way would effect drainage would also be good.
thanks