We have a ten year old house. We're kicking around the idea of finishing the basement DIY. It looks like we have some rough ins for a bathroom but I'm not sure it's a full bath.
There's a 2" pipe that runs to the ceiling, a 3" pipe about 14" from the wall, and a 4" pipe sunk into the ground with what looks like a clean out cap. Can someone help me sort out what the original intent may have been? How much work to make it a full or 3/4 bathroom?
Layout and photos below.
There's a 2" pipe that runs to the ceiling, a 3" pipe about 14" from the wall, and a 4" pipe sunk into the ground with what looks like a clean out cap. Can someone help me sort out what the original intent may have been? How much work to make it a full or 3/4 bathroom?
Layout and photos below.