I had a new gas line branch only added at the meter for a new second floor addition and kitchen remodel. I need to continue the rough work to reach the various appliances. Flexible SS line was used...
|
|
|
Type: Posts; User: Wally Pfautz; Keyword(s):
I had a new gas line branch only added at the meter for a new second floor addition and kitchen remodel. I need to continue the rough work to reach the various appliances. Flexible SS line was used...
I just added a second floor that completely covers the first, and want to specify roof vent penetrations before I shingle the new roof, which needs to happen ASAP since the rains have started in...
Thanks for the reply hj,
What I am thinking is that I would have all the building structure (framing)in place before asking for help so all the obstacles would be visible and could then be allowed...
In the plumbing business, is there such a thing as a design only service for the DIYer?
I'm about to embark on a one-man major remodel which will include adding a second story with two bathrooms,...