  1. The Jan 2005 building inspection reports refer to...

    The Jan 2005 building inspection reports refer to it as a monolithic slab. I don't really know how it's reinforced -- mesh or rebar. I don't believe that it's post tensioned. This is the typical...
  2. The slope from house to street was not measured,...

    The slope from house to street was not measured, but water flow down the pipe was rapid -- almost too rapid. I have contacted two construction defect attorneys, and will choose between them...
  3. Inadequate Main Drain Slope Under Mono-Slab

    I have a 5 year old home with mono-slab and about 92' of main line drain (sanitary sewer) under the slab measured by camera and cable from farthest toilet to clean-out just outside the MBR wall. The...