(206) 949-5683, Top Rated Plumber, Seattle

Search:

Type: Posts; User: Jerrylco; Keyword(s):

Search: Search took 0.10 seconds.

  1. Replies
    6
    Views
    1,586

    It is pretty strange that the property needs to...

    It is pretty strange that the property needs to go that far to the main, or that it needs to go to the sewer, but thats the way it is. The end of the main is 260 ft from the property line, and the...
  2. Replies
    6
    Views
    1,586

    Thanks for the reply, definitly lots of variable....

    Thanks for the reply, definitly lots of variable. I did know the old septic need to have the top broken and filled. The lines right now go from the house and are gravity feed to the septic tank using...
  3. Replies
    4
    Views
    790

    Thanks for the reply, I appreciate it. I didn't...

    Thanks for the reply, I appreciate it. I didn't describe the casing right, I'm still figuring this out. The steel casing is 6 5/8" for 0 to 126 ft. 4 1/2" PVC from 10' to 200'. The perf casing is...
  4. Replies
    6
    Views
    1,586

    Lift station installation

    Hi,
    I'm new to the forum, been on for 1/2 hr and already posting my second question. This looks like a greeat forum, lots of info and help.
    I'm purchasing a home that is currently on a septic...
  5. Replies
    4
    Views
    790

    New to forum, dirty well water

    Hello,
    I'm new to this forum and to having a well. This looks like a great forum, lots of good information and very helpful people and advice.
    I'm in the process of buying a house, it's been vacant...
Results 1 to 5 of 5