OK..
now lets start getting into something more interesting.
Here is a very rough drain plan for connecting to the existing stack.
3" Schedule 40 going through a >= 3.5 'cored' hole into...
|
|
|
Type: Posts; User: bself; Keyword(s):
OK..
now lets start getting into something more interesting.
Here is a very rough drain plan for connecting to the existing stack.
3" Schedule 40 going through a >= 3.5 'cored' hole into...
Terry: all good advice (even if some of it I didn't want to hear) :rolleyes:
1. On the pocket door. I agree and was thinking the same thing when I re-took measurements, but its kind of a done...
I am just starting to plan for plumbing a new addition master bathroom.
First some background in the for of a few long stories made short:
1. About a year ago we had a design/build firm put in...