The funny thing is that the inspector requested that the plumber/contractor test the cleanout as per contractor told me. I dont know if it had to be removed after the test.
Ok, so the issue here...
|
|
|
Type: Posts; User: lupe; Keyword(s):
The funny thing is that the inspector requested that the plumber/contractor test the cleanout as per contractor told me. I dont know if it had to be removed after the test.
Ok, so the issue here...
Ok. the drain combo on pic was placed about 1 1/2 yrs ago after a room addition that contains a shower, toilet and sink.
The "t" is 4 inch, then reduce to 3 inch to connect to new addation. The...
I would like to tap into this main drain for a laundry room.
Where should I tap into ?
Would it be a mistake if I connect to the clean out ?
I can unscrew the cap "whatever its called"
Pics are...
What should be the copper size for an addtion to a house ?
Its a restroom the includes a shower/toilet and sink.
Thanks in advance.
:)