I need to drain and disconnect zone for remodel work which could be few weeks. I will be hooking it up after work done but still need heat in other zones during work. Sorry wasn't clear on time it...
|
|
|
Type: Posts; User: rxdork; Keyword(s):
I need to drain and disconnect zone for remodel work which could be few weeks. I will be hooking it up after work done but still need heat in other zones during work. Sorry wasn't clear on time it...
I need to drain and temporarily disconnect 1 zone of 3 for a basement remodel. I have a shut-off valve going to boiler on each loop and a drain above each one. There isn't a shut off valve leaving...