So after several hours of banging and cutting the line is 9 inches from the top of pipe at point A to the top of my concrete slab. Now on to more work!!
|
|
|
Type: Posts; User: Jeremy Poling; Keyword(s):
So after several hours of banging and cutting the line is 9 inches from the top of pipe at point A to the top of my concrete slab. Now on to more work!!
Thanks for the reply. That is what I was afraid of..
What are the options if it is not deep enough??
Here is my basement. I am figuring that the toilet run will have to drop 5 inches. Do...
Hello Everybody - I spent some time browsing the forum and you guys really know your stuff... I know my stuff - but not plumbing so if I don't use the correct terminology I apologize!!
I am...