(206) 949-5683, Top Rated Plumber, Seattle

Search:

Type: Posts; User: Earth Fire Energy; Keyword(s):

Search: Search took 0.12 seconds.

  1. Heat Pump Requirements

    In order to preheat the water entering the boiler with a closed loop geothermal system without a heat pump, the ground temperature would need to be significantly warmer than the water your trying to...
  2. I agree with Gators comments. There are many...

    I agree with Gators comments. There are many factors that need to be accounted for to have a successful operating geothermal system. Soil thermal conductivity, fluid flow rates, depth of boreholes...
  3. Replies
    2
    Views
    3,751

    Water Flow Rate

    The flow rate of 5 usgpm is too low for a 5 ton heat pump. Most heat pumps of this size require about 12-15 usgpm. The biggest thing that needs to be thought about is the run time percentage. If...
Results 1 to 3 of 3