muskrat
New Member
- Messages
- 2
- Reaction score
- 0
- Points
- 0
My current unfinished basement was never roughed-in for any plumbing. I am in the planning stages of getting the basement finished and am curious as to what I am in store for if I want to install a 1/2 bath and a sink for a wet bar. Here are some pics of the current plumbing in the basement from the upstairs levels (kitchen sink and 1/2 bath on first floor, two full baths one of which has separate tub and shower as well as a washer/dryer on second floor).
Last edited by a moderator: