Rustycan
New Member
So I have posted some framing questions before, but now I have a different one. I have framed the jetted tub, leaving enough space under the edge of lip to sheath the side and top ledge with plywood, and still leave enough space under lip for thin set and the tile. I am thinking of doing it this way so the cut edge of the tile will be underneath the edge of tub. But does it matter if i tile under the edge of tub, or should i redo the frame seen below so the tub lip rests on the frame and THEN tile up to the edge? Are there any pros or cons I should be aware of?
here are pictures
here are pictures
Last edited by a moderator: