abrahuang
New Member
- Messages
- 19
- Reaction score
- 0
- Points
- 0
Thanks for the many helps from here, I put together the newest version:
Pls click to enlarge.
Does this look good? Do I need a cleanout at the 1 1/2" 90 elbow for accessing from back of the wetwall? Or change the 90 elbow to 45?
I ordered the 27x54x16 tub, it was said to be for above floor plumbing. So I thought the P trap can go into wetwall from above the ground.
http://www.lyonsindustries.com/product_residential/products/res_bath_2754-tub.html
it will need 3 weeks to arrive. I will breakdown the cement and try to tie the underground part together this weekend.
Pls click to enlarge.
Does this look good? Do I need a cleanout at the 1 1/2" 90 elbow for accessing from back of the wetwall? Or change the 90 elbow to 45?
I ordered the 27x54x16 tub, it was said to be for above floor plumbing. So I thought the P trap can go into wetwall from above the ground.
http://www.lyonsindustries.com/product_residential/products/res_bath_2754-tub.html
it will need 3 weeks to arrive. I will breakdown the cement and try to tie the underground part together this weekend.