Just wondering if a schedule 80 barb at the pump discharge is a thing? If so, that would theoretically eliminate any potential SS to SS sealing issues or any SS to Brass corrosion issues. Is galvanic corrosion really an issue with a ss pump discharge and a brass barb?
Something along the lines of https://www.bulkreefsupply.com/schedule-80-straight-reducing-barb-x-male-thread-1.html is what I was wondering about.
The obvious downsides are not as many barbs as the metal (especially the long barbs) and not sure if it would stand up to the stresses of lifting/lowering the pump.
Thoughts?
Something along the lines of https://www.bulkreefsupply.com/schedule-80-straight-reducing-barb-x-male-thread-1.html is what I was wondering about.
The obvious downsides are not as many barbs as the metal (especially the long barbs) and not sure if it would stand up to the stresses of lifting/lowering the pump.
Thoughts?